Section 01 · Portfolio

A pipeline of vetted regions, at their true stage.

Every region below has been screened against the same criteria: power availability, permitting posture, water reality, fiber, and community fit. Stages are honest and update as deals move. Specific parcels in each region are reserved for qualified conversations under NDA.

Region Record · Nevada Screening

Northern Nevada

Nevada · Tier 1
Acreage Band
50-100 acres
Campus Potential
100 MW

Established industrial power infrastructure with substation capacity adjacent to entitled land and park-scale on-site generation in the region.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Texas Screening

West Texas / ERCOT

Texas · Tier 1
Acreage Band
1,000+ acres
Campus Potential
1,000 MW

ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Screening

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
200-250 acres
Campus Potential
250 MW

Public-power utility territory with master-planned industrial park capacity and hyperscale precedent already inside the park.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Ohio Screening

Central Ohio

Ohio · Tier 1
Acreage Band
100-150 acres
Campus Potential
100 MW

Staged utility service growth on entitled land inside an established hyperscale cluster, with high-voltage transmission nearby.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Arizona Screening

Central Arizona

Arizona · Tier 2 Watchlist
Acreage Band
10-75 acres
Campus Potential
50 MW

Established technology corridor in SRP territory where major operators already run large campuses.

EST. CAPEX $61.4M / 5 MW
View region
Stage legend Screening Region under criteria review Due Diligence Active workstreams on specific parcels In Negotiation Commercial terms in motion

Directional estimates from planning-grade assumptions (Boston basis). Engineered pro formas are prepared per site on request.