Region Record · Texas

West Texas / ERCOT

Tier 1 Screening 1,000 MW campus potential
Regional benefits
Why this region UPDATED 2026-07-09
N1.ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.
N2.Gas transmission present and under construction in the corridor, a strong fit for the dual-fuel islanded microgrid architecture.
N3.Campus-scale land at West Texas cost basis: room for phased build-out from a first block to gigawatt-class ambitions.
N4.An active AI-infrastructure corridor with recent hyperscale precedent in the market.
Specific sites Specific parcels are under evaluation in this region. Exact locations, acreage, and site packages are reserved for qualified conversations and are discussed under NDA.
Expansion path

One design, three scales. Every campus in this region would start from the same engineered building blocks.

Step 01

2 MW edge block

The designed entry point: under one acre of site, a hall smaller than 1,000 square feet, suited to industrial parcels and existing buildings.

Step 02

5 MW designed blocks

The core building block. Dual-loop redundancy, phased so the first loop produces revenue before the second loop's capital is committed.

Step 03

Campus scale

Campuses grow by phased repetition of the designed blocks toward this region's campus potential. Each phase stands on its own economics.

Related regions

Elsewhere in the portfolio

View all regions →
Region Record · Nevada Screening

Northern Nevada

Nevada · Tier 1
Acreage Band
50-100 acres
Campus Potential
100 MW

Established industrial power infrastructure with substation capacity adjacent to entitled land and park-scale on-site generation in the region.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Screening

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
200-250 acres
Campus Potential
250 MW

Public-power utility territory with master-planned industrial park capacity and hyperscale precedent already inside the park.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Ohio Screening

Central Ohio

Ohio · Tier 1
Acreage Band
100-150 acres
Campus Potential
100 MW

Staged utility service growth on entitled land inside an established hyperscale cluster, with high-voltage transmission nearby.

EST. CAPEX $61.4M / 5 MW
View region