Region Record · Nevada

Northern Nevada

Tier 1 Screening 100 MW campus potential
Regional benefits
Why this region UPDATED 2026-07-09
N1.Established industrial power infrastructure with substation capacity adjacent to entitled land and park-scale on-site generation in the region.
N2.Fully entitled, data-center-approved industrial parcels available: use permits in place, no rezoning path required.
N3.Dry high-desert climate suits chiller-free adiabatic heat rejection and keeps water draw at the low end of the design range.
N4.No state corporate income tax and an established data center cluster (major operators already committed to the region).
Specific sites Specific parcels are under evaluation in this region. Exact locations, acreage, and site packages are reserved for qualified conversations and are discussed under NDA.
Expansion path

One design, three scales. Every campus in this region would start from the same engineered building blocks.

Step 01

2 MW edge block

The designed entry point: under one acre of site, a hall smaller than 1,000 square feet, suited to industrial parcels and existing buildings.

Step 02

5 MW designed blocks

The core building block. Dual-loop redundancy, phased so the first loop produces revenue before the second loop's capital is committed.

Step 03

Campus scale

Campuses grow by phased repetition of the designed blocks toward this region's campus potential. Each phase stands on its own economics.

Related regions

Elsewhere in the portfolio

View all regions →
Region Record · Texas Screening

West Texas / ERCOT

Texas · Tier 1
Acreage Band
1,000+ acres
Campus Potential
1,000 MW

ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Screening

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
200-250 acres
Campus Potential
250 MW

Public-power utility territory with master-planned industrial park capacity and hyperscale precedent already inside the park.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Ohio Screening

Central Ohio

Ohio · Tier 1
Acreage Band
100-150 acres
Campus Potential
100 MW

Staged utility service growth on entitled land inside an established hyperscale cluster, with high-voltage transmission nearby.

EST. CAPEX $61.4M / 5 MW
View region