Region Record · Arizona

Central Arizona

Tier 2 Watchlist Screening 50 MW campus potential
Regional benefits
Why this region UPDATED 2026-07-09
N1.Established technology corridor in SRP territory where major operators already run large campuses.
N2.Entitlement overlay streamlines approval: administrative sign-off with height allowances suited to data center massing.
N3.Desert water constraints make chiller-free, low-water cooling designs the natural fit; water posture must be verified parcel by parcel.
N4.Strategic Phoenix-market presence with edge and support parcels available while campus-scale tracts are pursued.
Specific sites Specific parcels are under evaluation in this region right now. Exact locations, acreage, and site packages are shared in qualified conversations under NDA. That discretion protects the deals, which protects everyone in them.
Expansion path

One design, three scales. Every campus in this region starts from the same engineered blocks, so no phase waits on new engineering.

Step 01

2 MW edge block

The designed entry point. Under one acre of site, a hall smaller than 1,000 square feet. It fits an industrial parcel, or a building you already own.

Step 02

5 MW designed blocks

The core building block, with dual-loop redundancy. The first loop earns revenue before the second loop's capital is committed.

Step 03

Campus scale

Campuses grow by repeating the designed blocks toward this region's potential. Each phase stands on its own economics.

Related regions

Elsewhere in the portfolio

View all regions →
Region Record · Nevada Screening

Northern Nevada

Nevada · Tier 1
Acreage Band
50-100 acres
Campus Potential
100 MW

Established industrial power infrastructure with substation capacity adjacent to entitled land and park-scale on-site generation in the region.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Texas Screening

West Texas / ERCOT

Texas · Tier 1
Acreage Band
1,000+ acres
Campus Potential
1,000 MW

ERCOT market with high-voltage transmission adjacent to large contiguous acreage and substation infrastructure at the boundary.

EST. CAPEX $61.4M / 5 MW
View region
Region Record · Oklahoma Screening

Northeast Oklahoma

Oklahoma · Tier 1
Acreage Band
200-250 acres
Campus Potential
250 MW

Public-power utility territory with master-planned industrial park capacity and hyperscale precedent already inside the park.

EST. CAPEX $61.4M / 5 MW
View region